Oreclaim
Afghan mineral rights

Fractional ownership of Afghan mineral wealth

Royalties and project claims — not trucks. Verified investors. Named deposits.

For mine sponsors and verified diaspora capital.

Known deposits

  • Mes AynakLogarCu
  • Sar-e-SangBadakhshanLapis
  • HajigakBamyanFe
  • PanjshirPanjshirEmerald

What the platform enforces

  • Verified identityInvestors complete hosted identity verification before any allocation. Identity documents never touch this platform.
  • Sanctions screeningSponsors and investors are screened against watchlists, and every match is adjudicated by staff rather than auto-cleared.
  • Licence verificationA sponsor's licence or JV claim is checked against the issuing authority's register before a project can list.
  • Full audit trailWho approved what, and when — recorded on every compliance decision the platform makes.
Process

How It Works

From mineral rights to fractional ownership in three steps.

  1. Package the rights

    Sponsors structure a named Afghan deposit into a royalty stream or project SPV — without selling the whole mine.

  2. Verify and list

    Diligence path (license, geology, independent review) before any offering goes live to verified buyers.

  3. Own a fraction, track yield

    Investors buy fractional units, track distributions in the portal, and transfer only to other verified holders.

What we package

What Oreclaim packages

Economic rights in mineral assets — plain-English ownership.

Royalty / production streams

Own a defined share of future production revenue from a named project — Franco-Nevada-style exposure without operating the mine.

Project SPV equity

Fractional equity in the vehicle that holds the license or JV — upside on exit or dividends, not diggers.

Reserve-linked claims

When audits exist, exposure tied to verified tonnes and grade — transparent assumptions, clear caps.

Sponsor capital without surrender

Raise phase-1 capital by selling a slice of economics while keeping operatorship and control.

Diaspora and regional capital

Verified investors abroad get home-resource exposure without going on-site to run a mine.

Transparent ownership record

Units, transfers, and distributions recorded clearly — compliance required; chain protocol is backend, not the pitch.

The chain

Nothing lists until it clears

Every project walks the same verification chain. An offering cannot exist until the steps before it are closed.

Illustration of the verification flow. Not an offering, and not a live project record.

Verification chain

  1. Sponsor identityCleared

    The organisation behind the claim is verified before anything else begins.

  2. Licence / JV claimCleared

    The mining right is declared and checked against the issuing authority's register.

  3. Sanctions screeningCleared

    Parties are screened against watchlists; any match is adjudicated, never auto-cleared.

  4. Diligence documentsIn review

    Geology, reserve reports and independent review are gathered against the project.

  5. OfferingLocked

    Only once the chain above is closed can units be structured and offered.

Who it's for

Two sides of the market

Oreclaim connects sponsors who need capital with investors who want fractions.

Sponsors

License holders and JV operators who need capital without selling 100% of the concession.

Raise on your licence

Investors

Diaspora professionals, regional HNWI, and family offices buying verified royalty or equity units.

See what's offered

Not forAnonymous meme tokens, equipment-as-investment, or buyers who want to operate the mine themselves.

Get started

Ready to package or invest?

Oreclaim turns Afghan mining economics into fractional digital ownership for verified participants.

Sponsors keep control · Investors buy rights · Royalty-first path